Fuse board replacement · Barry
From £700 + VAT (£840 inc VAT), tested and certified
A new consumer unit across Barry from £700 + VAT — board supplied and fitted, every circuit tested, certificate issued. Most are a single day with the power back on the same evening.
NAPIT registered 5.0 on Google, 45 reviews Based in Pencoed, Bridgend
Barry
Barry housing spans a century and the board tells you which era you are in before you have taken the cover off. The Victorian and Edwardian terraces around Barry Town and Cadoxton still throw up rewireable boards — actual fuse wire, or the cartridge type that replaced it. No RCD protection at all, which means nothing disconnects automatically if a cable is damaged or an appliance develops a fault.
The post-war estates at Colcot, Buttrills and Gibbonsdown are where the most common Barry job sits: a plastic consumer unit with a single RCD covering everything. It was compliant when it went in and it is not dangerous, but one fault anywhere takes out the whole house — including the freezer and the lights, while you are trying to find the cause. Since 2016 the regulations have also required non-combustible enclosures in domestic properties, which is why a plastic board under a wooden staircase now attracts a C3 on an EICR, and worse if it sits on an escape route.
The Waterfront and Highlight Park builds are usually fine, and Aled will say so rather than sell you a board you do not need. Where a replacement is genuinely warranted it is from £700 + VAT, and the upgrade to individual RCBOs — one device per circuit, so a fault takes out one thing rather than the house — is worth the small difference on nearly every job.
What is included
More on fuse board replacement, or for everything else, your electrician in Barry.
5.0 on Google. Not one below five stars.
NAPIT registered, public liability insured, 12+ years on the tools. The same person quotes the job, does the work and signs the certificate.
Read all 45 reviewsBarry questions, answered
From £700 + VAT for a standard domestic replacement, including the board, full testing and certification. If the existing wiring throws up problems once the board is off, you are told before any extra work happens — never afterwards.
A few hours in the middle of the day rather than all day. Most Barry board changes are done, tested and certified inside one working day, with the power back on the same evening.
Not necessarily, and be wary of anyone who says yes without testing. Persistent tripping is usually a fault on a circuit rather than a faulty board — in Barry, very often moisture in an outside socket or an old garage supply. The fault gets found first. Replacing the board without finding it just moves the problem.
Not illegal, and it does not have to be ripped out. Since 2016 the regulations have required non-combustible enclosures in domestic installations, so a plastic board typically attracts a C3 "improvement recommended" on an EICR — and can be coded more seriously if it sits under a wooden staircase or on an escape route.
Tell Aled what you need and you will get a straight answer, a same-day callback and a written quote within 24 hours. No call centre, no subcontractor.
NAPIT registered · Mon to Sat, 7am to 6pm · Based in Pencoed, Bridgend