Sheds · garden offices · outbuildings

Proper power to your shed or garden office. Not an extension lead across the lawn.

Getting power to a shed, garden office or outbuilding is a fixed electrical installation: buried steel-wired armoured cable from the house, the right protection at both ends, and usually a small consumer unit in the building. It is notifiable work, so it has to be tested and certified. Aled looks at your garden and your fuse board in person, then puts a written quote in your hands within 24 hours, so you know the exact figure before anything starts.

NAPIT registered 5.0 on Google, 38 reviews Based in Pencoed, Bridgend

What's involved

What a proper outbuilding supply actually takes

A correctly done shed or garden-office supply has a few non-negotiable parts. Done this way, the outbuilding behaves like a safe, certified extension of your home's electrics, rather than a bodge that fails the first wet winter.

  1. 01

    Survey the garden and the board

    Aled looks at the route from the house to the building, the ground it crosses, the load you need out there, and whether your existing fuse board and main supply can take the new circuit. The design depends on distance and demand, so this comes first.

  2. 02

    Run buried SWA armoured cable

    Steel-wired armoured cable, sized for the load and the distance, is run in a trench deep enough to protect it, with warning tape laid above. Where it makes sense, SWA can be clipped high along a wall or fence to save digging. Walls, patios and drives are worked into the plan.

  3. 03

    Protect both ends + fit a sub-board

    The new circuit gets its own correctly rated protection at the house end, and most installations get a small consumer unit in the outbuilding with RCD protection, so lights, sockets and heating out there are properly protected and separately switched.

  4. 04

    Test, certify and notify

    The whole installation is tested and certified to the current wiring standard, and the work is notified to building control through Aled's NAPIT registration. You get the paperwork that proves it is safe and signed off.

No surprises

What a proper job includes

  • A survey of the route, the ground and your existing board first
  • Buried steel-wired armoured (SWA) cable, sized for load and distance
  • Warning tape above the cable and the correct burial depth
  • A sub-board in the outbuilding with RCD protection, where needed
  • Separate switching, so you can isolate the building from the house
  • Full testing, certification and building-control notification

A single outdoor socket or one light can be wired more simply. Anything you actually spend time in, an office, a workshop, a gym, is far better served by its own little board.

A typical job

The garden office at the bottom of the garden

A common job around Bridgend and the Vale: a new garden room or office that needs proper power for lighting, sockets, heating and the day-to-day kit of working from home. Aled runs SWA from the house, fits a small sub-board out there with its own RCD protection, and certifies the lot, so it is warm, lit and safe to work in year-round, with paperwork a future buyer or surveyor will be happy with. The same approach covers sheds, workshops and home gyms.

Written quote within 24 hours

Bigger jobs, done clean and certified

5.0 on Google across 38 reviews, none below five stars. Every word verbatim.

Full house rewire - October 2023 I cannot recommend Aled and his team enough - fantastic job they were very professional very personable very tidy and kept to the timetable and price agreed. I don’t think you can ask for anymore!! Thank you Aled/Renovolt!
Tracey Daniel Full house rewire 5.0
After a free quotation and house survey work was carried out professionally very clean and tidy full rewire on existing home Including media wall, outside security, full new kitchen design, options were discussed ideas were given for improvements, very friendly, trustworthy and professional highly recommend.
Austen Alex Full rewire + kitchen 5.0
Aled has undertaken a lot of work for us, from basic light and socket installation, to rewiring entire sections of our house, plus installing a complex fire alarm system, lighting and electrical supply in our commercial unit. His work standards are exceptional and extremely professional. I would highly recommend him for all electrical work.
Julian Davies Domestic + commercial 5.0

Read all 38 reviews

Straight answers

Questions, answered.

How is power run to a garden shed or office?

With buried steel-wired armoured (SWA) cable from your fuse board to the building, the right protection at both ends, and usually a small consumer unit in the outbuilding, all tested and certified. It is a proper fixed installation, not an extension lead, so it is safe to leave out in the weather and rated for the load you actually need.

How deep does the cable to an outbuilding need to be buried?

As a rule of thumb, around 450mm under a lawn or border, and deeper where it runs under a driveway or anywhere vehicles go, with cable warning tape laid above it so future digging gets a warning. SWA can sometimes be clipped along a wall or fence at high level instead, which saves digging. The exact depth and route are set by the survey.

Does a garden office need its own consumer unit?

For anything beyond a single light or socket, yes. A small sub-board in the outbuilding gives you local RCD protection, separate switching so you can isolate the building without killing the house, and room to add lighting, heating and sockets safely. A single outdoor socket or light can be wired more simply.

Can I run a shed off an extension lead permanently?

No. A trailing extension lead is a trip hazard, it is not rated to be left out in the weather, and it cannot safely carry the load of a heated office, tools or a fridge over time. A building you use regularly needs a proper buried, protected and certified circuit. An outdoor lead is fine for a quick one-off, like a strimmer on a dry afternoon.

Will my fuse board and supply cope with an outbuilding?

It depends, which is why the work starts with a look at your existing setup. Adding an outbuilding load draws on your main service fuse and your consumer unit. If your board has a spare way and is in good condition, the new circuit drops in. If it is old or full it may need attention first, the same check that applies before an EV charger or heat pump. You are told what your property actually needs before any price is set.

Is wiring a supply to an outbuilding notifiable work?

Yes. A new circuit feeding an outbuilding is notifiable under the Building Regulations, so it must be designed, installed, tested and certified to the current wiring standard, then notified. As a NAPIT-registered electrician, Aled handles that certification and notification as part of the job, so you end up with paperwork that proves it is safe and signed off, which matters if you ever sell the house.

Power your shed or office, properly.

Tell Aled what the building is for and roughly where it sits in the garden, and he'll survey it and put a written quote in your hands within 24 hours. Buried, protected and certified.

NAPIT registered · Mon to Sat, 7am to 6pm · Based in Pencoed, Bridgend