Real job · Kenfig industrial estate
New three-phase supply on the Kenfig industrial estate
A unit on the Kenfig industrial estate, in Bridgend county, needed more power than it had. Aled brought in a new three-phase supply through underground ducting.
NAPIT registered 5.0 on Google, 43 reviews Based in Pencoed, Bridgend
Kenfig industrial estate · Posted on Aled’s Instagram before May 2026
What Aled did
- New three-phase supply brought into the unit through underground ducts (the duct ends are visible in the floor in the photo).
- A new three-phase distribution board, fitted inside steel trunking on the block wall.
- A 400-volt isolator for the supply, with danger labels fitted.
- Cable tray along the wall and floor to carry the cables neatly into the board.
- An LED batten light over the board.
The kit
Why it matters
Businesses on the Bridgend and Kenfig estates often outgrow a single-phase supply when they add machinery, chargers or heating. Three-phase work has to be planned with the supply side, labelled properly and certified.
More on commercial and industrial electrical work, or everything Aled does locally: electrician in Bridgend. Aled is based in Pencoed, ten minutes from Bridgend town centre.
Where this comes from: Aled's Instagram post, saved when the site was first built in May 2026 with its details (new three-phase supply, underground ducting, Kenfig industrial estate), and what the photo shows. No customer details are published. About Aled.
More real jobs
Other recent jobs



More on the recent jobs page. Aled is based in Pencoed and works right across Bridgend: your local electrician in Pencoed and electrician in Bridgend.
Got a job like this?
Send Aled a photo and a line about what you need. Same-day callback, written quote within 24 hours.
NAPIT registered · Mon to Sat, 7am to 6pm · Based in Pencoed, Bridgend